INTRODUCTION
ASA Computers is now a partner of Green Revolution Cooling to provide best liquid immersion cooling for data centers.GRC is The Immersion-Cooling Authority®. The company's patented immersion-cooling technology radically simplifies deployment of data center cooling infrastructure. By eliminating the need for chillers, CRACs, air handlers, humidity controls and other conventional cooling components, enterprises reduce their data center design, build, energy, and maintenance costs. GRC's solutions are ideal for next-gen applications platforms, including artificial intelligence, blockchain, HPC, 5G, and other Edge Computing and core applications. Their systems are environmentally resilient, sustainable, and space saving, making it possible to deploy their solutions in virtually any location with minimal lead time.
How does Single-Phase immersion-cooling Works?
- No CARCs/CARHs/Humidity Control
- No raised flor
- No chillers needed
- 10 — 20% reduction in server power by removing fans
- 3% of compute load required for cooling
- Accepet any type of facility water
- Sub-Optimal environment ready
- Hardware agnostic: any standard ( or custom) server
- Coolant does not degrade or evaporate
- Servers are completely immersed in a non-conductive Non-corrosive coolant — ElectroSafe®
- Coolant is circulated through the rack to capture heat
- Heat is typically rejected via a liquid-to-liquid heat exchanger
- Very energy efficient
- Ability to handle 200 KW/rack
- Supports industry standard servers with minor mods
- Low cost coolant that does not Evaporate
- Virtually no material compatibility issues
- Mechanically simple — low maintenance & CapEX costs
GRC's Server Value Proposition
GRC immersion-cooling systems combination cut down the price for you.
Radical Simplification
Cost Savings Capex & Opex
Limitless Capacity & Flexibility
Cost Reduction
60%
Data Center Construction Costs
90%
Cooling Energy Expenses
50%
Total Energy & Maintenance Costs
GRC's Server Infrastructure
With GRC immersion-cooling systems you have fewer infrastructure requirements.
Air Cooling |
Liquid Cooling |
|
---|---|---|
Humidity Controls |
||
CRAC/CRAH |
||
Chiller |
||
Cooling Tower |
||
Large Backup Generator* |
||
Hot/Cold Aisle & high roof |
||
Raised Floors/Special Floors |
||
Installation Time |
Months |
Weeks |
*Generator size proportional to designed peak power
- Required
- Partially Required
- Not Required
Request Information